First-time maintenance of aerial vehicles is particularly important

The first-time maintenance of aerial vehicles is called turn-in maintenance or break-in maintenance. The number of kilometers that can be maintained according to the model varies from 3,000 km to 5,000 km, while the 1500 km within this distance is the caution period. It is the break-in maintenance. Among the top priorities, in the caution period, the first thing to notice is that the load on the vehicle should not be too high. Even if it is a car industry that can take 5 people, it should not be filled with people. During this period, one or two people drive the car everywhere. It is best to run. Never choose a road to drive more complex roads at the beginning, such as pit lanes, unusually crowded roads (the stop-and-go movement of vehicles is very bad for the running-in period), etc. , take smooth roads, let the vehicle run in a smooth state. Then there is the problem of speed, many people know that the speed of the run-in period should not be too fast, this is correct, but experienced people know that the run-in period from time to time Running high speeds is helpful for vehicles, because not only the engine, transmission, four-wheel mechanical system and tires need to continue to warm up at a certain speed, so that the "communication" between each other achieves the best results.

After the caution period, there is no need to change the engine oil in time. However, if the period of caution is not completed, replacing the high-quality engine oil between the running-in periods is very beneficial to the high-altitude vehicle engine.

After a cautious period, the speed of high-altitude vehicles can be appropriately increased, but it is better not to exceed 120 km/h. The road surface can also be slightly rougher, but you still need to be careful. Whether it is a 3,000-km or 5,000-km run-in period Don't do the maintenance until you reach the top, change it earlier, and then check the whole car. This will help the future of the vehicle after a reasonable first maintenance is completed.

X Ray Machine

The system matches with metal ceramic X-ray tube and high frequency solid insulate industrial X-ray HT generator, it applies forced cooling system to make sure X-ray machine can normally continuous work for 24 hours. The dimension of this kind of small focus X-ray tube is half of traditional focus tube, geometry unintelligibility is an important factor which affects image quality, if focus bigger, correspondingly, geometry unintelligibility is deeper, and also makes image edge much more blur; if focus smaller, geometry unintelligibility is lighter, it can improves image quality at same time, also focus is smaller can inspect smaller failure which is favor to improve X-ray RTR inspection stability.

The controlling part of system is researched and manufactured by ourselves, the intelligent main control PLC works matches with touch screen, beautiful and complete functional stainless steel panel that can display and adjust parameters much more convenient. When high voltage of system opens, there will be red light alarming signal outside of protect door, here installs interlock devices between lead door and system, in the case of opening lead door, system will stop radiation at once to assure safety of operators.

Units For X Ray RTR System

Butt Weld Pipe RTR System,Boiler Pipe RTR System,Casting RTR System,Wheel Hub RTR System

Dandong Nondestructive Testing Equipment Co., Ltd. , http://www.ddchinaxray.com

Posted on