Compressed air pipes for new and old equipment should be carefully designed

In order to adapt to the development of the production of steel pipe branch, meet the demand for compressed air, make the air compressor set and layout reasonable, convenient management and maintenance, low operating cost and economical. Due to the compact land use, new air compressors can only be installed in the original air compressor station. This project is to use the two air compressor station stations in the East and West Districts to transform 8 old air compressors and auxiliary equipment in the two station buildings in phases. When arranging a new air compressor, it is necessary to consider not only the space occupied by the new air compressor itself, but also sufficient space and maintenance space for the equipment. Since the old air compressor that has not been dismantled occupies a large area, this brings great difficulty to the transformation of this project. It is quite difficult to arrange.

It is necessary to reproduce and produce, that is, to ensure the production of gas at the same time of transformation. In the design process, make full use of the annual repair gap to create conditions for batch transformation. When installing a new device, it must not affect the normal operation of the old device. When the old device is removed, the normal operation of the new device cannot be affected. In order to ensure the production of gas, the compressed air pipeline, cooling water pipeline and power supply cable of the old and new equipment must be carefully designed to ensure that nothing is lost. The original oil-injected screw air compressor in the air compressor station and post-processing equipment such as after-cooler and refrigerating dryer. The original circulating cooling water system of the Steel Pipe Branch is located in the Eastern District, and the production users of the entire plant and the users of the original air compressor stations are basically not rich. The close cooperation of various professions ensures the smooth completion of the project objectives. The various stages of the project transformation did not have any impact on the production of the steel pipe branch.

Dispensing Nozzle

Dispenser Nozzle,Nonstandard Soldering Nozzle,Spinneret Puffing Nozzle,Dispensing Nozzle

Changzhou Jier Precision Machinery Manufacturing Co., Ltd. , http://www.jier-spinneret.com

Posted on