38 mining terminology

1. Hillside open pit mine: Above the open-pit mining boundary circle is the hillside open pit mine.

2. Sag open pit mine: Below the closed-loop mining boundary, it is a hollow open pit mine.

3. Closed circle: The closed curve formed by the upper boundary of open-pit mining at the same elevation.

4. Open pits: The sum of pits, steps and open channels formed by open pit mining.

5. Blasting belt: During mining, the working steps are divided into several strips and sequentially mined one by one, and each belt is called a blasting belt.

6. Mining belt: The width of the excavator once excavated is the mining belt.

7. Steps: When open-pit mining, the ore is usually divided into horizontal stratification of a certain thickness, mining from top to bottom and maintaining a certain advanced relationship. In the process of mining, each work level is stepped, and each step is a step.

8. Non-work gang: The surrounding surface of the open pit consisting of the step platform, the slope surface and the bottom of the ditch that ends the mining work is called non-work gang.

9, the final side help: When the non-work help is in the final state, it is called the final side help; the bottom help is located on the side of the lower side of the ore body to help the bottom.

10, top gang: the side of the side of the upper part of the ore body is called the top gang.

11, end help: located at the ends of the ore body to help the end help.

12. Work gang: The side help consisting of the steps that are being mined and the ones to be mined are called work gangs.

13. Final slope angle: The angle between the final slope surface and the horizontal plane is called the final slope angle.

14. Final slope surface: When the non-work slope is at the final boundary, it is called the final slope.

15. Work to help the slope angle: The angle between the work slope and the water level is called the work slope angle.

16. Work to help the slope: The imaginary slope made by the work to help the bottom line of the last step and the bottom line of the bottom step is called the work slope.

17. Work flat: The platform for the work of mining and peeling is called the work flat.

18. The lower final boundary line (bottom perimeter): the intersection of the final leather surface and the bottom plane of the open pit is the lower final boundary line (bottom perimeter) (the platform on the final side is divided into safety platforms according to its purpose, Transport platform and cleaning platform).

19. Safety platform: used to cushion and block the falling rock and slow down the final slope angle to ensure the stability of the final side and the safety of the lower level.

20. Transportation platform: as the transportation contact channel between the working steps and the access and ditch.

21. Cleaning platform: used to block the falling rocks and clean them with cleaning equipment, which plays the role of a safety platform.

22. Stripping ratio: The ratio of the amount of rock removed and the amount of ore that is mined, that is, the amount of rock to be stripped per ton of ore is called the stripping ratio (t/t m3/m3).

23. Average stripping ratio (np): The ratio of the total rock mass (V) to the total ore amount (A) in the open-pit mining boundary (t/t m3/m3) np=Vp/Ap.

24. Stratified stripping ratio (nf): The ratio of the amount of rock to the ore volume at a certain level in the open-pit mining boundary (t/t m3/m3)nf=Vf/Af.

25. Horizon stripping ratio (nj): The ratio of rock increment to ore increment (t/t m3/m3)nj=V/A after increasing the unit depth in the open-pit mining boundary.

26. Production stripping ratio (ns): the ratio of the amount of rock stripped from the amount of ore mined in a certain production period of the open pit mine (t/t m3/m3) ns=Vs/As.

27. Economically reasonable stripping ratio (njh): refers to the maximum allowable amount of rock excavation (t/t m3/m3) in the open pit mining unit.

28. Total amount of stripping: the sum of the amount of ore produced and the amount of rock produced.

29. Access to the ditch: Establish a transport path between the ground and the working level and between the levels.

30. Open trench: An approximate horizontal channel that is drilled at each level to open up the mining line.

31. Mine production capacity (t/a ton/year): It is expressed by two indexes of ore production capacity (Ak) and ore production capacity (A), namely A=Ak (1+ ns).

32. Reasonable service years of mine: It refers to the service life of a mine determined by the best economic benefit and the industrial reserves obtained.

33. Open-pit mining boundary and composition: refers to the spatial outline formed by the end of open-pit mining (or a certain period of time). It consists of the surface boundary of the open pit, the bottom perimeter and the four surrounding slopes.

34. Open-pit mining and stripping methods: It is to study the mining, stripping and mining engineering mining procedures in open-pit mining and the temporal and spatial relationships between them.

35, open pit mode of transport: rail transport, road transport, ramps skip hoisting transport, combined transport, the main form of transport belt conveyors, hydraulic transport, and gravity transportation.

36. Blasting parameters: chassis resistance line, hole distance, row spacing, proximity coefficient, borehole ultra deep, filling length, explosive unit consumption and charge per hole.

37. Drilling technology: It is divided into automobile transportation—bulllifting of bulldozers, railway transportation—excavation of excavators, rock excavation of ploughing excavation, front loading of rock, and drainage of rock-discharging machine.

38. Main factors affecting the stability of waste rock yard: topographic slope, abandonment height, basement rock stratum structure and its bearing capacity, geotechnical properties and stacking sequence; common instability phenomena are landslides and debris flows.

we can supply you the Marine Engine with gearbox( Boat Engine ) ,Inboard Boat Motor, propeller and shaft , if you need any of them , please contact me. We are the only one factory that can supply you the Complete Marine Engine

The model Diesel Engine are designed according to the use requirements and the structure features of the marine engine .  After we optimized the design for the matching parts, the main features of this type diesel engine are the stronger power , the bigger continuous output and the lower fuel and oil consumption . we fix the stainless pipe on this model diesel engine and adopt the Dacromet technology on the surface in order to prevent the corrosion. This diesel engine is reliable and durable . There is a small window on the sid of the diesel engine to maintain easily . Because the diesel engine came out in serial form, the matching parts are in common use, it is convenient to supply the matching parts . The flywheels power take-offs can be equipped with the outboard machinery or engine-mounted marine gearbox .The diesel engine used for marine have two kinds of configuration , one is the simple configuration, which is without a heat exchanger and a water cooled exhaust manifold , the other is the complex configuration , which with a heat exchanger and a water cooled exhaust manifold

2m78 marine engine with gearbox

Marine Engine

Deutz Diesel Engine,Boat Diesel Engine,Boat Engine,Inboard Boat Motor

Shijiazhuang Houfeng Trading Co.,Ltd , https://www.hfdieselengine.com

Posted on