How to manage the 60 concrete mixing station in Leting County

How to manage the 60-concrete mixing plant in Leting County This year, the average road and highway speeds in the Laoting County are 88.6% and 66.4%, respectively, 0.1% and 0.2% higher than the previous year. Except for trunk road signs, the good rate is 99%. In addition, the transformation rate of dangerous bridges and dangerous tunnels, the rate of transformation of tunnel lighting standards, the accuracy rate of highway road signs, and the repair rate of water damage projects have all reached 100%. Zhengzhou Changli Company 60 concrete mixing station requires that the entire work flow of the electrical control system be controlled automatically during production, that is, the management personnel of the entire concrete mixing plant production site can complete the entire process without too much. When the weighing system of the concrete mixing station is equipped with a zero output, the electrical control system can automatically remove tare weights and correct the drop. For a single weighing material, the weighing function must have a buckle function to control the measurement accuracy more effectively. There must be a light reminder device. The output force of the cylinder of the Henan Changli Machinery 60 Concrete Mixing Plant is not sufficient and its movement is not smooth. It is generally caused by piston or piston rod stuck, poor lubrication, insufficient air supply, or condensed water and impurities in the cylinder. In this regard, the center of the piston rod should be adjusted; check whether the operation of the oil mist filter is reliable; whether the gas supply pipeline is blocked. When there is condensed water and impurities in the cylinder, it should be promptly removed. The No.150 synthetic extreme pressure industrial gear oil is installed inside the geared motor of Zhengzhou Changli Company 60 concrete mixing station. The amount of oil injection must be strictly in accordance with the value on the nameplate. Too much or too little oil will affect the efficiency and normal operation of the drum motor. The drum is replaced after 200-300 hours of operation. After every 500 hours, the oil is changed once. When the oil is changed, the two oil plugs should be unscrewed and the drum should be rotated to the low position until the internal gear oil All finished. The Mixer of Zhengzhou Changli Machinery 60 Concrete Mixing Plant can be equipped with a humidity and temperature tester, which can realize real-time temperature and humidity detection and control systems to ensure the stability of high-performance concrete; the whole station is fully computer controlled and has formula storage, Fall auto compensation, automatic moisture content compensation, automatic storage of results, printing and other functions; imported electrical components, advanced manufacturing processes, high reliability; reliability industrial computer, optimized design, advanced features; four-screen remote monitoring system, The operating status is clear at a glance; the mixer maintenance channel is provided with power-off protection to ensure safety and reliability. Zhengzhou Changli Company 60 Concrete Mixing Plant has two control modes: linkage and manual. The two modes can be switched flexibly and have a high degree of automation. The linkage process is: start the equipment after starting the mixing station to stir the motor, the aggregate weighing instrument and the cement weighing instrument and the water weighing instrument are started, and the small concrete mixing station will automatically discharge the material to the lifting bucket after discharging the ingredients. After the lift the bucket automatically rises. After reaching the upper limit, it automatically stops and discharges the aggregate to the mixer. The cement and water began to unload and stop after unloading to zero. After lifting the bucket, the material is automatically lowered (the pause time is adjustable), and the operator observes the concrete mixing condition. After passing the check, the concrete mixer discharge button is pressed to complete the linkage process. Zhengzhou Changli is a manufacturer of concrete mixing plants, commercial concrete mixing plants, engineering concrete mixing plants, stable soil mixing plants, commercial mixing plants, concrete mixers, cement mixers, cement silos (cement tanks), concrete trucks, and cement tankers. The company has a complete and scientific quality management system. With the aim of customer supremacy, our company specializes in the technical cooperation of domestic design institutes and experts, and can provide customers with one-stop services such as project design, process design, equipment installation and commissioning. There are tens of thousands of customers in domestic and foreign markets. We sincerely welcome friends from all walks of life to visit, guide and negotiate business. Zhengzhou Changli takes technology innovation as the guide, seeks quality with scientific management, survives with high-quality products, and serves its users as its mission. Through continuous learning and independent innovation, it has also become a leading company in the industry. Zhengzhou City Changli takes the management policy of high quality, low cost, and good service, with the principle of valuing contracts and keeping promises as its operating principles. The entrepreneurial spirit of pioneering and innovative is willing to go hand in hand with the old and new users in the economic construction to support each other and develop together. Related Content: 1000 blender price/pro-20.html 500 blender/pro-2938.html 60 blender/pro-35.html

Chemical Hydraulic Diaphragm Metering Pump(Chemical Metering Pump)

* Suggested liquid temperature range: -30℃ --- 100℃

* Adjust the stroke length to effect the flow rate

* Pump color: Green 

* Double or triple pump heads is available.

* Hydraulic actuated Diaphragm Metering Pump, no leakage.                                                             

* The flow can be adjusted from 0-100% while it's running or stopped.                                                                                                     

*With the design of inner changeable release Safety Valve and limited auto-compensation valve.                                                                                                                                                      

* Diaphragm material: PTFE                                                                                                            

* Both manual control and digital control for 4-20mA is available.                                                        

* Double diaphragm design with diaphragm rupture alarm system.                                                                                               


Chemical Hydraulic Diaphragm Metering Pump

Cheme Hydraulic Diaphragm Metering Pump,Chemical Cheme Hydraulic Diaphragm Metering Pump,Small Cheme Hydraulic Diaphragm Metering Pump,Big Cheme Hydraulic Diaphragm Metering Pump,Phosphate Injection Pump,Chemical Metering Pump

Zhejiang Ailipu Technology Co., LTD. , http://www.alipu.com

Posted on