Standard | DIN315 |
Material | SS304, SS316 |
Specification | M1.6-M48 |
Head shapes | Round head |
Screw thread | Coarse thread  |
Screw tip | Flat point |
Finish  | A2-70/A2-80/A4-70/A4-80 |
Features | Good anti-corrosion ability |
Grade | A2, A4 |
Certification | ISO9001:2008, SGS, RoHS, Bureau Veritas |
OEM service is also available |
Product Detail
Factory Introduction
Our main factory is located in Xinghua city, Jiangsu province and has been in the fastener industry since 2002. We are the branch in Zhongshan City. In order to provide a fast service for domestic customers, we set a warehouse in Zhongshan, so our response time is within 24 hours for domestic customers. For overseas customers, we can delivery the standard fastener within 3 days, and non-standard one in 15 days.Â
Package and Shipment
Our standard package is: neutral inner white box and outer carton, usually 6Â pcs/box according to sizes, outer carton is 27*27*17cm. Pallet is needed if the products are too heavy. For colorful boxes, extra fee will be charged.Â
FAQ
A: Are you a factory or a trader?
We are manufacturer with factory plant located in Xinghua city, Jiangsu province and we are the the branch in Zhongshan city
B: What is your MOQ?
1PC is acceptable,but only for standard products
C: can IÂ have my own design products?
Yes, we also offer OEM service and can provide non standard products as well.
D: How is your lead time?
For standard products, we mostly have product in stock, so we can make fast delivery. For domestic market(within 24 hours), for oversea market(within 3Â days the fastest). For non-standard products or out of stock products, lead time is usually around 15 days.
E: do you have a website, where can I see your new products?
Yes, our website is www.rankoofastener.com. You can see our new products both from here or through our website
F: Do you also produce fasteners with other material?
No, we only deal with stainless steel material.Â
Â
 DIN315 M6 M8 Stainless Steel Wing Nuts
Standard | DIN315 |
Material | SS304, SS316 |
Specification | M1.6-M48 |
Head shapes | Round head |
Screw thread | Coarse thread  |
Screw tip | Flat point |
Finish  | A2-70/A2-80/A4-70/A4-80 |
Features | Good anti-corrosion ability |
Grade | A2, A4 |
Certification | ISO9001:2008, SGS, RoHS, Bureau Veritas |
OEM service is also available |
Product Detail
Factory Introduction
Our main factory is located in Xinghua city, Jiangsu province and has been in the fastener industry since 2002. We are the branch in Zhongshan City. In order to provide a fast service for domestic customers, we set a warehouse in Zhongshan, so our response time is within 24 hours for domestic customers. For overseas customers, we can delivery the standard fastener within 3 days, and non-standard one in 15 days.Â
Package and Shipment
Our standard package is: neutral inner white box and outer carton, usually 6Â pcs/box according to sizes, outer carton is 27*27*17cm. Pallet is needed if the products are too heavy. For colorful boxes, extra fee will be charged.Â
FAQ
A: Are you a factory or a trader?
We are manufacturer with factory plant located in Xinghua city, Jiangsu province and we are the the branch in Zhongshan city
B: What is your MOQ?
1PC is acceptable,but only for standard products
C: can IÂ have my own design products?
Yes, we also offer OEM service and can provide non standard products as well.
D: How is your lead time?
For standard products, we mostly have product in stock, so we can make fast delivery. For domestic market(within 24 hours), for oversea market(within 3Â days the fastest). For non-standard products or out of stock products, lead time is usually around 15 days.
E: do you have a website, where can I see your new products?
Yes, our website is www.rankoofastener.com. You can see our new products both from here or through our website
F: Do you also produce fasteners with other material?
No, we only deal with stainless steel material.Â
Â
Â
Pre-insulated Pipe Fabrication
Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.
All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling
Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine
WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.pipefusionweldings.com