Project Name: Tongren Hongxiang Jinjiang Haopin Real Estate Project Progress: Project Proposal Construction Period: 2011-2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, lighting facilities, ventilation facilities, cranes
Project Description:
The project is located in Caojiayuan District, Tongren City, Guizhou Province. The planned land area of ​​the project is approximately 37,432 square meters, and the total construction area is 2,091,141.51 square meters. The residential building consists of 10 buildings and other ancillary facilities.
The total investment of the project is 450 million yuan.
Construction Unit: Guizhou Hongxiang Real Estate Development Co., Ltd. Postal address: 9th Floor, Hongxiang Building, No. 2 Yan'an Middle Road, Guiyang Postcode: 550001
Contact: Long Zhen, telephone fax
Zoomlion concrete pump Spare Parts
Introduction Of Company
HBYM is a big supplier in china.We produce spare parts for Putzmeister, Schwing, Sany , Zoomlion etc . Products include: S valve, swing lever, outer housing, Plunger Cylinder, upper housing assy, wear plate , cutting ring ,motor etc . We have a manufacture factory(Cangzhou Hongcheng Machinery Equipment Co., LTD) and a trading company(Cangzhou Xingwei International Trade Co., LTD) .So we can ensure the quality and delivery time.And we can give you a competitive price.
Advantages:
1,We can give you a competitive and detail price,when i receive your inquire.
2,If you have special need in surface and package,we can do as your need.
3,After you purchase from us,we will supply a superior service for you.
4,We had took part in many exhibitions,and get good reviews from colleagues.
If buyer need special model products, factory can produce as per buyer's drawing .
If you have need of concrete parts,Cangzhou Hongcheng Machinery Equipment is your best choice.
Zoomlion Concrete Pump Parts Description
|
|||
battery |
Zoomlion Wear Sleeve |
Zoomlion Coupler |
Zoomlion DIsk |
|
|||
Zoomlion Piston |
Mixer Shaft For Trailer Pump |
Magnet Switch |
Motor |
|
|||
Plunger Cylinder For Boom Pump |
Plunger Cylinder For Trailer Pump |
Tadiator |
S valve |
|
|||
Swinging Lever For Boom Pump |
Swinging Lever For Trailer Pump |
Upper Housing Assy for Boom Pump |
Schwing Valve |
There are many other brands on sales:
1)Schwing Concrete Pump Parts;
2)Zoomlion Concrete Pump Parts;
3)Sany Concrete Pump Parts;
4)IHI Concrete Pump Parts.
Package&Delivery
1)Package:Wooden Packing
2)Delivery Time:5-12 Days(After receive advance payment)
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.And we have a trading company,so we can give you a competitive price.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Zoomlion Spare Parts,Trailer Pump,Boom Pump Shaft,Boom Pump Mixer Shaft
HBYM GROUP Co,.LTD , http://www.hbympumpparts.com